CLICK HERE FOR FREE BLOGGER TEMPLATES, LINK BUTTONS AND MORE! »

Monday, October 24, 2011

To be on a tropical island...

If you recall, my new kitchen design has an island in it.  The size of the island and the overall size/flow of the kitchen precludes having a sink in the island, but it doesn't mean I don't want electricity.  That's where the sweat and mess come in.  If you remember, my floor is made of concrete.  Because I'm not fond of the wires running across the top of the floor look, some major work was going to be involved in getting power to the island.  Yuck.

In order to know where to run the electricity, we had to know where the island was specifically going to go.  Trust me, after all the work it was going to take, I didn't want the darn thing in the wrong spot.  So, we cleared the decks in the kitchen and taped off the floor.  Thankfully there was a large divot (?) (not sure which word to use, so throwing a golf one in because it seems to be the same thing to me) from the old cabinetry, so we decided that was as good of a starting point as any place.   Any port in a storm.  We used an angle grinder borrowed from a friend to cut the channels before using an air hammer chisel out the concrete. 


In the picture it seems so simple and easy to do, kinda like on tv.  No big deal, cut three simple pieces out, and run some wiring.  H.A.  H.A.  In case you're missing the bigger picture, here's one that gives a better perspective...


So, with Marc running the air hammer and myself running the vacuum, we trudged on.  I ran the vacuum as a close distance, sometimes too close, sorry dad, in an effort to keep down the dust.  If you've never worked with concrete before, it rates right up there with grout & tile in terms of dusting mess and skin drying potential.  (Note to self, maybe I shouldn't wear flip-flops while doing concrete.)  I did tape off the doors and turn off the A/C to help with the effort, but I still need to scrub the whole house...


So, on and on we trudged, inch by inch, and what did we discover? 

Rebar? 


Are you kidding me?  Rebar is only supposed to be every 2 feet, so I've been told, so what were the odds that the rebar would be running directly through the middle of where we were headed?????


Add to that another cattle panel, and the headaches were growing.   Thankfully, God was on our side and the rebar sat just low enough for us to be able to run a piece of conduit for the wiring.  All in all, I'm guessing it took just over 8 hours of angle grinding, vacuuming, air hammering and all the necessary safety gear, except steel toed boots to complete the job. Please note, that when I say complete the job, I don't mean finish the whole project, just chipping out the concrete.


It took another entire day to put in the wiring conduit. 


Due to the unlevel nature of the chipping concrete, so not going there, and the levelness of the conduit, the pipe wouldn't sit below the grade of the concrete.  Out came the heat gun, just enough to bend the conduit so that it stayed where it was supposed to.  It takes a while to heat up the conduit to bend it and it takes just as much time to cool it down.  Not to worry.  I had the uber heavy drain pipe from kitchen sink that had been cut out.  Boom!  Conduit done!  Finally. 


While it may not be a tropical island, I'm pretty sure I'll enjoy this island much, much more in the long run!!

Wednesday, October 19, 2011

A Shocking Start

While work progresses on the outside of the house, we continue to plod along inside with various projects.  The latest efforts have been toward finishing the electrical in the kitchen.  As with so many things in life, in order to complete one thing you have have back waaaaaay up and do 3 other things first.  The end goal is the of course have a kitchen, but a sooner goal is to have all 4/5 walls of my kitchen drywalled.  (Remember, my room is an oddly shaped dining room/kitchen combination of 4 walls and in one place 5.) 

The original kitchen in this place was a tiny, little hot mess with a wall oven, push button cooktop, pendant sink light, fridge and not much else.  Think about all of the electrical needs in today's typical kitchen, dishwasher, under/above cabinet lighting, recessed ceiling lighting, fridge, island, wall oven, range, etc.  Anyone else seeing an issue here?  Yeah, not nearly enough power in the kitchen.  It was at that point I realized that I had to pick which appliances I wanted.  Wonderful, something else to do before doing the thing I wanted to do.  You see, without knowing which appliances I want, it's almost impossible to know where to spec the electrical and once the drywall in is, it would be a HUGE pain, not to mention mess to change it.

While you might think that it would be a blast picking a kitchen full of appliances, it's hard when you've already made yourself a promise.  From the very beginning of this house project, I've promised myself that I would never settle for less than what I wanted, really wanted, instead I would just do without.  (hmm, so far I'm doing good.  Hence the reason I've been living with studs for 2 years.)  All in all, it's been easy to keep this promise to myself.  I live alone and function okay without certain things, like a stove.  Grits, my favorite work breakfast and chicken are easy to make on my hot plate.  Just think about how much easier it will be to make them when I have this installed.


Oh a girl can dream!!  Top it off with a super ventilation system and this girl would be in heaven.

Not to worry you, I haven't left reality.  Here is a more current kitchen pic.


Notice the hours of work?


Each little caption is equivalent to hours of work in a relatively clean attic, several feet of expensive wire (ouch,) new switches and only a couple of drops of blood.  What's the most depressing part of it all?  Once the drywall is up, no one will ever know the hours of work involved.  Instead, a switch will flip and a light will come on or something will move and no one will think twice, so I'm calling a moment for you to appreciate all this hardwork.

Even though there are hours of hardwork behind us, and now a well appreciated electrical plan has been laid into place, a large piece is still missing.  Remember my sentence from above?  (It's okay, I know there were a tons of sentences from above, so I'll help you out.)  Think about all of the electrical needs in today's typical kitchen, dishwasher, under/above cabinet lighting, recessed ceiling lighting, fridge, island, wall oven, range, etc.  Do you see it?  No?

that little word,

such a simple word,

island...

Remember my floor??

No?

I'll remind you next time...

Monday, October 17, 2011

Taxes...

Several people have commented via email on the absurdity of the fact that our local county taxes on concrete.  While I agree it's nuts, the county looks on my basketball court/holder of branches as an unimproved patio, hence the taxes.  Now, I'll be the first to say that the added value of my "unimproved patio" is little, but I'm in the world that every single penny counts!!  So that sucker is gone and my world is looking greener.




Thanks to two very precious rains, new grass is already starting to poke it's head through the dirt.  I am also pleased to say that after the two heavy rains, my carport was much, much drier than before the re-grading.  It did collect some rain, but nothing compared to the  pre-grading mess.


My latest addition is this huge pile of concrete remains.  Because the original pourers of the basketball slab used a cattle panel to reinforce the concrete, my debris cannot be dumped at the local dump.   So, my poor landscaper is scrambling trying to find a place to dump it.  Anyone need any fill dirt???